 | |
| | |
| Before. |
 | |
| | |
| After. |
 | |
| | |
| Before. |
 | |
| | |
| After. |
 | |
| | |
| Before. |
 | |
| | |
| After. |
Did not replace wood. Pressure wash and refinish. Refamed the skurfboards.
 | |
| | |
| Before. |
This dock was in bad shape after a rough encounter with a hurricane.
Work was done to restore elevation and correct alignment.
By not having to demolish the entire dock, the owner saved thousands of dollars.
 | |
| | |
| After. |
 | |
| | |
| Before. |
 | |
| | |
| After. |
 | |
| | |
| Before & After. |
Both pieces of this Ipe Decking were installed at the same time. The grey is the natural color that occurs if left untreated.
The brown has been refinished.
 | |
| | |
| Before. |
Pressure wash and refinish.
 | |
| | |
| After. |
 | |
| | |
| Before. |
 | |
| | |
| After. |
Copyright 2007 - DOCKS LLC.